Calm open water at the Arcata Marsh with hills behind
Step-by-step guide

Build an Arcata-style system

How a small city on Humboldt Bay turned its sewage plant into a wildlife sanctuary, and how you can adapt it.

Arcata Marsh and Wildlife Sanctuary, Arcata, California, looking east-southeast across the southern end of the marsh. The marshes have polished the city’s treated wastewater since 1986 (US EPA, 1993) Photo: Monotropa uniflora, Public domain, via Wikimedia Commons.
Educational guide only. Any real system must be designed and stamped by licensed engineers and permitted by your state water board and other regulators (in the US, under the Clean Water Act / NPDES). Local soils, climate, flows, and discharge rules change everything.
Arcata, California at a glance

Proof it works

1986Full system completed, after a 1979–1982 state-funded pilot
US$5.3MTotal cost (1985 dollars)
~$225,000Treatment wetlands, about $30,000 per acre
17,000+People served on Humboldt Bay

Replicated in places including Oaxaca (Mexico), the West Bank, Egypt, Thailand, Indonesia, and Palo Alto and Petaluma, California.

Today the City runs 55 acres of oxidation ponds and 154 acres of treatment marshes (City of Arcata, Wastewater).

Sources: City of Arcata; Friends of the Arcata Marsh; US EPA NEPIS (EPA 832-R-93-005e, EPA constructed wetlands manual).
How the water moves

The treatment train

  1. Headworks and primary treatment
    Screens, grit removal, clarifiers; solids to anaerobic digesters.
  2. Two oxidation ponds
    About 55 acres, ~5 ft deep, ~9 days.
  3. Six treatment wetlands
    2–4 ft deep, ~1.9 days, native bulrush.
  4. Three enhancement wetlands
    Inside the public Arcata Marsh and Wildlife Sanctuary.
  5. Disinfection, then Humboldt Bay.

Performance (EPA, 1997 averages)

BOD (biochemical oxygen demand), mg/L

Raw influent174
After oxidation ponds53
After treatment wetlands28
After enhancement marshes3.3
MeasureRawFinal
BOD (mg/L)1743.3
Total suspended solids (mg/L)2143
Total nitrogen (mg/L)403
Source: US EPA NEPIS. Sizes and detention times vary between documents and have changed with upgrades; check current figures with the City of Arcata.
Best-in-class pond design

The Oswald–Green Advanced Integrated Pond System

Arcata uses conventional oxidation ponds plus wetlands. For new plants, the strongest pond design we know of is the Advanced Integrated Wastewater Pond System (AIWPS), developed over about 50 years of research by William J. Oswald, UC Berkeley professor of civil and environmental engineering and public health, with F. Bailey Green, his former PhD student in Berkeley’s Energy and Resources Group. It is often called the Oswald–Green system.

Instead of running blowers, it uses anaerobic fermentation for solids and algae photosynthesis for oxygen. Sludge handling is largely eliminated for many years, and the methane can be captured as biogas. US EPA lists AIWPS plants at St. Helena (1965), Hollister (1977), Delhi (1998), and Hilmar (1999), California.

The pond train, A to D

Raw sewage in →→ reclaimed water outAAdvanced facultative ponddigester pitBHigh-rate algal pondCAlgae settling pondDMaturation pond
  1. A. Advanced facultative pond with in-pond anaerobic digester (fermentation) pits, 6–8 m deep. Raw sewage enters at the bottom; solids settle and ferment to methane.
  2. B. High-rate algal pond a shallow paddle-wheel raceway, under 1 m deep. Algae make oxygen for bacteria and take up nutrients.
  3. C. Algae settling pond algae settle out and are collected for drying.
  4. D. Maturation pond storage, further disinfection by sunlight and time, and solids removal before reuse.
Stages as described by US EPA, Principles of Design and Operations of Wastewater Treatment Pond Systems, EPA/600/R-11/088 (2011), section 5.2. Stage B can be a secondary facultative pond instead, depending on the level of treatment. Simple diagram, not to scale.

Experts and resources

For specifications, research, and people who could help with design. Listing a resource does not mean they endorse or work with this project.

UC Berkeley

Where Oswald taught and AIWPS was developed. Berkeley’s tech-transfer office documents the Oswald–Green company and the AIWPS technology.

Oswald Green Technologies (UC Berkeley IPIRA)
Berkeley Civil & Environmental Engineering

UC San Diego

The California Center for Algae Biotechnology (Cal-CAB), based at UC San Diego and Scripps Institution of Oceanography, works on algae biotechnology, including algae grown in wastewater.

About Cal-CAB
Cal-CAB people
Scripps Institution of Oceanography

Cal Poly San Luis Obispo

Professor Tryg Lundquist, PE (UC Berkeley PhD), researches natural wastewater treatment with ponds and wetlands and algae processes.

Tryg Lundquist, Cal Poly CEENVE

Credit for AIWPS belongs to William J. Oswald (1919–2005) and F. Bailey Green. We are not affiliated with UC Berkeley, UC San Diego, Cal Poly, or Oswald Green Technologies.

Teasel seed heads beside open water at the Arcata Marsh
The process

Nine steps

Short and simple. Each one builds on the last.

Open water and shoreline plants at the Arcata Marsh, Arcata, California. Photo: Spifferella, CC BY-SA 2.0, via Wikimedia Commons.
  1. 1

    Assess flows and land

    Measure flows and loads; map land, soils, and where treated water will go.

  2. 2

    Run a pilot

    Arcata piloted wetland cells from 1979 to 1982 before going full scale.

  3. 3

    Talk to regulators early

    Agree on discharge limits and how pilot results will be judged with your state water board.

  4. 4

    Headworks and digesters

    Screen, settle, and digest solids, and capture the biogas. More at Reimagine Landfills.

  5. 5

    Oxidation ponds

    Sun, algae, and bacteria treat the water over days, not hours.

  6. 6

    Treatment wetlands

    Shallow cells planted with native bulrush lower BOD further.

  7. 7

    Enhancement marsh

    Final marshes double as a public wildlife sanctuary.

  8. 8

    Monitor everything

    Sample every stage; partner with a local college, as Arcata did with Humboldt State.

  9. 9

    Scale to your population

    • Town One train of ponds and wetlands near the plant.
    • City Parallel cells, biogas cogeneration, wetlands as a park.
    • Region Decentralized systems can beat one plant with long pipelines.
    • State Permit pathways, pilot funding, shared design standards.
Disclaimer. This guide is educational. It is not an engineering design, and nothing here replaces licensed engineers, site studies, or permits from your state water board and other agencies.